Working process flowchart
Site Survey
1、Preliminary survey, develop energy-saving plans based on on-site data collection, and estimate the approximate energy-saving rate.
Survey Content Table Download
2、After you approve the preliminary plan, if there are no specialized measuring tools such as flow meters and electric meters on site, we will install flow meters, electric meters, and IoT modules based on the pipeline conditions on site, collect relevant data, and ultimately determine the gas electricity ratio as an important basis for contract settlement.

Online installation of flowmeter

Online installation of flowmeter

Installtion for electricity meter and IoT module

Installtion for electricity meter and IoT module

Confirmation of energy-saving plan
Based on real-time and accurate data collection, we have updated the energy-saving renovation report for you and proposed two business cooperation models, namely the equipment buyout model and the energy-saving sharing model of EMC (or PPA).
Download Proposal Template
Business model confirmation
01.
Equipment procurement mode

Equipment procurement mode

Equipment procurement mode

By measuring the energy efficiency of the old station building, calibrating the gas to electricity ratio, and calculating the energy-saving ratio after investing in new equipment, the customer determines the mode of self procurement after calculating the return on investment.

02.
Energy-saving sharing mode

Energy-saving sharing mode

Energy-saving sharing mode

By measuring the energy efficiency of the customer's old station building, calibrating its gas electricity ratio, calculating the energy-saving ratio, agreeing on the electricity bill, signing an agreement with the customer, and achieving energy-saving through station building renovation, the energy-saving part is shared with the customer, benefiting both parties.

03.
Gas selling mode

Gas selling mode

Gas selling mode

Agree on the selling price per cubic meter of compressed air and the customer's electricity cost, calculate the revenue based on the amount of gas used by the customer and the electricity consumed by the station building, and the customer pays according to the amount of gas used.

Construction acceptance and maintenance
Construction, installation, and maintenance services must be fully localized. We have local construction management and engineering personnel in Thailand, and can provide quick and responsive maintenance.