Working process flowchart
1、Preliminary survey, develop energy-saving plans based on on-site data
collection, and estimate the approximate energy-saving rate.
Survey Content Table
Download
2、After you approve the preliminary plan, if there are no specialized measuring tools such
as flow meters and electric meters on site, we will install flow meters, electric meters,
and IoT modules based on the pipeline conditions on site, collect relevant data, and
ultimately determine the gas electricity ratio as an important basis for contract
settlement.
Online
installation of flowmeter
Online
installation of flowmeter
Installtion for electricity meter and IoT module
Installtion for electricity meter and IoT module
Confirmation of energy-saving plan
Based on real-time and accurate data collection, we have updated the
energy-saving renovation report for you and proposed two business cooperation models,
namely the equipment buyout model and the energy-saving sharing model of EMC (or PPA).
Download Proposal
Template
Business model confirmation
01.
Equipment procurement mode
Equipment procurement mode
Equipment procurement mode
By measuring the energy efficiency of the old station building, calibrating the
gas to electricity ratio, and calculating the energy-saving ratio after
investing in new equipment, the customer determines the mode of self procurement
after calculating the return on investment.
02.
Energy-saving sharing mode
Energy-saving sharing mode
Energy-saving sharing mode
By measuring the energy efficiency of the customer's old station building,
calibrating its gas electricity ratio, calculating the energy-saving ratio,
agreeing on the electricity bill, signing an agreement with the customer, and
achieving energy-saving through station building renovation, the energy-saving
part is shared with the customer, benefiting both parties.
03.
Gas selling mode
Gas selling mode
Gas selling mode
Agree on the selling price per cubic meter of compressed air and the customer's
electricity cost, calculate the revenue based on the amount of gas used by the
customer and the electricity consumed by the station building, and the customer
pays according to the amount of gas used.
Construction acceptance and maintenance
Construction, installation, and maintenance services must be fully localized.
We have local construction management and engineering personnel in Thailand, and can provide
quick and responsive maintenance.