language
language
1、Lack of data monitoring and analysis

Manual inspection, Manually adjust machine and parameter, low efficiency

Unable to measure actual air consumption, power consumption.

The existing station is old, more faults, low efficiency

2、Unable preform AI control based on data analysis

Failure to maintain in a timely manner affects the life span

Supply and demand mismatch, frequent loading and unloading

Lack of management of post-processing equipment leads to unstable air quality

Pain points caused
1. 10-30% energy waste in station
2. Unstable quality of Compressed air
3. Waste of labor
Online
consultation
Service Hotline

+66 0917707839